Timeline
One author (direction, verdicts, the final in-game check) and Claude as lead architect (design, code, correctness, written record, and since Oct 31 the bridge test passes and Editor imports; see AI Disclosure). Project start: Aug 3, 2026.
- Dates: work dates. A range means the work spanned those days.
- Rule since day one: engine behavior is claimed only from the decompiled game or a field test.
- Each phase says what it unlocked for the next one.
At a Glance
Section titled “At a Glance”| Phase | Dates | What it unlocked |
|---|---|---|
| 1. A lift that draws | Aug 3-7 | A chairlift line you can draw on any slope, with power. |
| 2. Runs, snow and a lodge | Aug 10-19 | The first full loop: sign, lodge, lift, runs, power and money. |
| 3. Moving chairs and the hub | Sep 22-Oct 5 | Chairs that ride the rope, runs that rate themselves, one panel, and guests who come to ski. |
| 4. The big asset round | Oct 10-20 | Four lift types and eight buildings with one look. |
| 5. Tools and release preparation | Oct 20-31 | One lift tool, cat tracks, the Resort Planner, the Ski Bus, and a release plan. |
| 6. Polish on the mountain | Nov 1-10 | Steep lines, swinging chairs, a groomer, merged buildings, and the release build. |
1. A Lift That Draws
Section titled “1. A Lift That Draws”Aug 3-7. A resort needs a lift first. Five days took the project from a blank Editor to a chairlift line that draws, connects and takes power.
- Aug 3: project start. One day of concept and spec. The lift became a drawn network, with a code mod for what assets cannot do.
- Aug 3-4: the first stations, towers and chairs were imported into the game.
where it all began…
- Aug 4: the first chairlift line that draws in the game.
the very first chairlift, with a gray doorway for a top station and big dreams
- Aug 4-5: the cables connect to the stations.
- Aug 6: lines connect on any slope.
- Aug 6-7: tower heights follow the terrain, and the cable sags between the towers.
- Aug 7: power flows through the lift. The lift network reached beta after five days.
2. Runs, Snow and a Lodge
Section titled “2. Runs, Snow and a Lodge”Aug 10-19. With a lift in place, the mountain needed something to ski on and somewhere to warm up. This phase ended with the first full loop in the game.
- Aug 10: the Ski Resort menu tab under Parks & Recreation, with the attraction score, the snow line and the first trail surfaces.
- Aug 10: the first building, an A-frame base lodge.
- Aug 11: the lodge became an upgrade of one resort entity, the Welcome Sign. One entity gives the resort its identity, and its size follows from what is built. Size tiers S, M and L were rejected.
- Aug 11: runs first show snow. The game’s snow simulation carries the white, and decals carry the corduroy.
21 °C in June, and nobody told the run it was summer
- Aug 12-17: run props and night lighting passed their field test. The snow code got faster: from 18-37 ms down to 2-5 ms.
bare mountain, suspiciously white run: the day we knew snowmaking would work
- Aug 19: a lift takes its power through one door, the base station.
- Aug 19: the first full loop in the game. Welcome Sign, lodge, stations, lift, runs, power and economy all work together.
3. Moving Chairs and the Hub
Section titled “3. Moving Chairs and the Hub”Sep 22-Oct 5. The resort worked, but the chairs stood still and the tools were hard to find. This phase made the lift move and gave the resort one panel.
- Sep 22: the game updated to 1.6.2. An audit found that nothing the mod relies on had changed.
- Sep 22: the first field test of moving chairs failed. The chairs did not move at all. The cause was found the same day: the lift’s ends were not recognized as stations. After the fix, 134 chairs rode a 1,383 m loop.
- Sep 22: the chairs turn around the bullwheel at each station.
- Sep 30: a tree tool for runs, and slope shading while you draw a run.
- Sep 30-Oct 1: the run rating was rewritten after play found green runs too hard to draw. The rating now follows the hardest unavoidable pitch, with bands at 6, 25, 40 and 60 %.
- Oct 1: the Ski Resort hub, the first in-game panel. The sign was hard to find, so the tools were combined into one panel.
- Oct 3: the hub lists ski areas, lifts and runs. A lift section can be bulldozed by itself.
- Oct 4: the natural run, the ski-area attraction score, ticket fees and a redesigned hub.
- Oct 5: ski days. In testing, a town lodge drew 162 guests a month and the real hill drew 2. Residents now choose the nearest venue of the leisure type they want, so the lodge claims a share of leisure trips.
4. The Big Asset Round
Section titled “4. The Big Asset Round”Oct 10-20. Until now the resort had one chairlift and one lodge. This phase built the rest of the hardware and the buildings, and gave them one look.
- Oct 11: five lodges, the Ski School, the patrol hut and patrol HQ, and the Welcome Sign.
- Oct 11: tram stations designed from a lift-engineering reference, with every platform reachable.
- Oct 11-12: the Grand Lodge, a U-plan around a pool court, with a plaza, a valet drive and vanilla trees and benches.
- Oct 13: one long import session brought in the towers, stations, chairs and cabins for the detachable chairlift, the gondola and the aerial tram.
- Oct 14: tickets are booked as public-transport fares, so ticket cash shows in the Economy panel.
- Oct 14: season passes, priced at about 65 % of lift revenue, bought once and not refundable.
- Oct 15: economy numbers approved: ticket 40 to 60, lodge spend 15, a lesson fee and pre-season pass sales. Lodges and the Ski School carry upkeep and staff.
- Oct 16: snow rules set: guns make snow up to 3.3 °C, and a run opens at 15 cm of snow.
- Oct 16: one shared tile sheet for all eight buildings, with walls close to vanilla texel density inside hard triangle caps.
- Oct 18: tram stations switched to plain glass, because lit fake interiors looked wrong at night. The stations got their own tile sheet.
- Oct 18: hub history: guests and finances per month.
- Oct 19: hub redesign: a single net figure, a simpler Finances chart and a clearer History chart.
- Oct 19: windows became plain glass with lit backing plates. Vanilla’s fake room interiors read wrong in a ski building.
- Oct 19: the tower planner. Each tower’s height follows the terrain along the line.
- Oct 19: the Ski School became a top-level building.
- Oct 19: all eight buildings and both tram stations in the game on their tile sheets.
- Oct 19: vanilla sub-objects are used wherever one exists, since they carry more detail for less effort.
5. Tools and Release Preparation
Section titled “5. Tools and Release Preparation”Oct 20-31. A near-full-year playthrough showed what a player needs next: fewer tools that do more. The release plan was written in the same weeks.
- Oct 20: the playthrough set the numbers for release: every run opens at 91 cm, snow guns run October to March, ticket 80, lessons 30 %, season pass 2 tickets.
- Oct 20: the five lodges and both patrol buildings became standalone buildings, like the Ski School, instead of Welcome Sign upgrades.
- Oct 20: one lift tool for all four lift types, numbered towers and a cat track grading tool.
- Oct 22: the release plan. The mod goes straight to 1.0 on Paradox Mods, with no public beta. All buildings and props were signed off, and the licenses were set: code MIT, art CC BY-NC-SA 4.0.
- Oct 25: a cat track became one action: lay out the track, and one key grades the ground and builds it. Cat tracks cross runs without changing them.
- Oct 25: Quick Runs, an experimental planner that proposes runs for a slope. Two days later it was renamed the Resort Planner.
- Oct 26: the lift tool shows each tower’s height and a ghost preview while you plan a line.
- Oct 30: the Resort Planner was merged for 1.0 as an experimental feature, off by default.
- Oct 31: a test bridge lets Claude drive test passes in the running game. The first pass found a crash after a hub row delete. It was fixed the same day.
- Oct 31: the Ski Bus Depot, a coach stop in town. Its coach drives between the depot and the hill.
6. Polish on the Mountain
Section titled “6. Polish on the Mountain”Nov 1-10. The features were in. This phase made them hold on steep ground and in big cities, and made the hub easier to read.
- Nov 1: a performance pass on a city of 355,000. With the mod removed, the frame rate changed by under 1 %.
- Nov 1-2: a snow groomer drives the cat tracks, with its lights on at night. An A-Frame, Chalet or Grand lodge with no road can be supplied over a cat track.
- Nov 2: a run’s type became a set of features: groomed or natural, with snow guns and lights as options.
- Nov 3: on all four lift types, each chair and cabin hangs from a grip that follows the rope, and swings in the wind.
- Nov 4: steep lines. Each lift type has a rope pitch limit per tower, and towers lean on steep ground.
- Nov 5: the hand test of the steep-line build. The verdict: “very, very good”, with 27 notes to fix.
- Nov 5: lifts of different types can cross, and towers keep off roads.
- Nov 6: an existing city building can be merged into a ski area as a lodge. The ski area radius became an option, with a ring on the ground.
- Nov 7: the hub was redesigned again: simple on the surface, with each number one layer down.
- Nov 9: chairlift and gondola stations cut a level pad into the slope.
- Nov 9-10: the Resort Planner plans the runs first, then proposes the lifts that serve them, and builds those lifts.
- Nov 10: the game updated to 1.6.4f1 “Seasonal Shift”. The mod was checked against it the same day. The release screenshots were retaken on the final build.
Next: the final playtest, then 1.0 on Paradox Mods. For what comes after that, see the Rough Roadmap.