Skip to content

Timeline

One author (direction, verdicts, the final in-game check) and Claude as lead architect (design, code, correctness, written record, and since Oct 31 the bridge test passes and Editor imports; see AI Disclosure). Project start: Aug 3, 2026.

  • Dates: work dates. A range means the work spanned those days.
  • Rule since day one: engine behavior is claimed only from the decompiled game or a field test.
  • Each phase says what it unlocked for the next one.
Where it ended up: a resort's runs and cat tracks on the piste map.
Phase Dates What it unlocked
1. A lift that draws Aug 3-7 A chairlift line you can draw on any slope, with power.
2. Runs, snow and a lodge Aug 10-19 The first full loop: sign, lodge, lift, runs, power and money.
3. Moving chairs and the hub Sep 22-Oct 5 Chairs that ride the rope, runs that rate themselves, one panel, and guests who come to ski.
4. The big asset round Oct 10-20 Four lift types and eight buildings with one look.
5. Tools and release preparation Oct 20-31 One lift tool, cat tracks, the Resort Planner, the Ski Bus, and a release plan.
6. Polish on the mountain Nov 1-10 Steep lines, swinging chairs, a groomer, merged buildings, and the release build.

Aug 3-7. A resort needs a lift first. Five days took the project from a blank Editor to a chairlift line that draws, connects and takes power.

  • Aug 3: project start. One day of concept and spec. The lift became a drawn network, with a code mod for what assets cannot do.
  • Aug 3-4: the first stations, towers and chairs were imported into the game.
August 3, 2026: the game's Editor with the Asset Importer open. The first fixed-grip lift towers lie flat on the grass.

where it all began…

  • Aug 4: the first chairlift line that draws in the game.
August 4, 2026: the first chairlift line climbs a hillside in the Editor, with gray towers and dark chairs. A plain gray block stands in for the top station.

the very first chairlift, with a gray doorway for a top station and big dreams

  • Aug 4-5: the cables connect to the stations.
  • Aug 6: lines connect on any slope.
  • Aug 6-7: tower heights follow the terrain, and the cable sags between the towers.
  • Aug 7: power flows through the lift. The lift network reached beta after five days.

Aug 10-19. With a lift in place, the mountain needed something to ski on and somewhere to warm up. This phase ended with the first full loop in the game.

  • Aug 10: the Ski Resort menu tab under Parks & Recreation, with the attraction score, the snow line and the first trail surfaces.
  • Aug 10: the first building, an A-frame base lodge.
  • Aug 11: the lodge became an upgrade of one resort entity, the Welcome Sign. One entity gives the resort its identity, and its size follows from what is built. Size tiers S, M and L were rejected.
  • Aug 11: runs first show snow. The game’s snow simulation carries the white, and decals carry the corduroy.
August 11, 2026: a run under the first chairlift, white with corduroy stripes. The game's status bar reads summer, 21 °C. The developer menu is open on the left.

21 °C in June, and nobody told the run it was summer

  • Aug 12-17: run props and night lighting passed their field test. The snow code got faster: from 18-37 ms down to 2-5 ms.
August 13, 2026: a long white run winds down a bare valley in fall, at 2 °C. Only the run and the trees beside it are white.

bare mountain, suspiciously white run: the day we knew snowmaking would work

  • Aug 19: a lift takes its power through one door, the base station.
  • Aug 19: the first full loop in the game. Welcome Sign, lodge, stations, lift, runs, power and economy all work together.

Sep 22-Oct 5. The resort worked, but the chairs stood still and the tools were hard to find. This phase made the lift move and gave the resort one panel.

  • Sep 22: the game updated to 1.6.2. An audit found that nothing the mod relies on had changed.
  • Sep 22: the first field test of moving chairs failed. The chairs did not move at all. The cause was found the same day: the lift’s ends were not recognized as stations. After the fix, 134 chairs rode a 1,383 m loop.
  • Sep 22: the chairs turn around the bullwheel at each station.
  • Sep 30: a tree tool for runs, and slope shading while you draw a run.
  • Sep 30-Oct 1: the run rating was rewritten after play found green runs too hard to draw. The rating now follows the hardest unavoidable pitch, with bands at 6, 25, 40 and 60 %.
  • Oct 1: the Ski Resort hub, the first in-game panel. The sign was hard to find, so the tools were combined into one panel.
  • Oct 3: the hub lists ski areas, lifts and runs. A lift section can be bulldozed by itself.
  • Oct 4: the natural run, the ski-area attraction score, ticket fees and a redesigned hub.
  • Oct 5: ski days. In testing, a town lodge drew 162 guests a month and the real hill drew 2. Residents now choose the nearest venue of the leisure type they want, so the lodge claims a share of leisure trips.

Oct 10-20. Until now the resort had one chairlift and one lodge. This phase built the rest of the hardware and the buildings, and gave them one look.

  • Oct 11: five lodges, the Ski School, the patrol hut and patrol HQ, and the Welcome Sign.
  • Oct 11: tram stations designed from a lift-engineering reference, with every platform reachable.
  • Oct 11-12: the Grand Lodge, a U-plan around a pool court, with a plaza, a valet drive and vanilla trees and benches.
  • Oct 13: one long import session brought in the towers, stations, chairs and cabins for the detachable chairlift, the gondola and the aerial tram.
  • Oct 14: tickets are booked as public-transport fares, so ticket cash shows in the Economy panel.
  • Oct 14: season passes, priced at about 65 % of lift revenue, bought once and not refundable.
  • Oct 15: economy numbers approved: ticket 40 to 60, lodge spend 15, a lesson fee and pre-season pass sales. Lodges and the Ski School carry upkeep and staff.
  • Oct 16: snow rules set: guns make snow up to 3.3 °C, and a run opens at 15 cm of snow.
  • Oct 16: one shared tile sheet for all eight buildings, with walls close to vanilla texel density inside hard triangle caps.
  • Oct 18: tram stations switched to plain glass, because lit fake interiors looked wrong at night. The stations got their own tile sheet.
  • Oct 18: hub history: guests and finances per month.
  • Oct 19: hub redesign: a single net figure, a simpler Finances chart and a clearer History chart.
  • Oct 19: windows became plain glass with lit backing plates. Vanilla’s fake room interiors read wrong in a ski building.
  • Oct 19: the tower planner. Each tower’s height follows the terrain along the line.
  • Oct 19: the Ski School became a top-level building.
  • Oct 19: all eight buildings and both tram stations in the game on their tile sheets.
  • Oct 19: vanilla sub-objects are used wherever one exists, since they carry more detail for less effort.

Oct 20-31. A near-full-year playthrough showed what a player needs next: fewer tools that do more. The release plan was written in the same weeks.

  • Oct 20: the playthrough set the numbers for release: every run opens at 91 cm, snow guns run October to March, ticket 80, lessons 30 %, season pass 2 tickets.
  • Oct 20: the five lodges and both patrol buildings became standalone buildings, like the Ski School, instead of Welcome Sign upgrades.
  • Oct 20: one lift tool for all four lift types, numbered towers and a cat track grading tool.
  • Oct 22: the release plan. The mod goes straight to 1.0 on Paradox Mods, with no public beta. All buildings and props were signed off, and the licenses were set: code MIT, art CC BY-NC-SA 4.0.
  • Oct 25: a cat track became one action: lay out the track, and one key grades the ground and builds it. Cat tracks cross runs without changing them.
  • Oct 25: Quick Runs, an experimental planner that proposes runs for a slope. Two days later it was renamed the Resort Planner.
  • Oct 26: the lift tool shows each tower’s height and a ghost preview while you plan a line.
  • Oct 30: the Resort Planner was merged for 1.0 as an experimental feature, off by default.
  • Oct 31: a test bridge lets Claude drive test passes in the running game. The first pass found a crash after a hub row delete. It was fixed the same day.
  • Oct 31: the Ski Bus Depot, a coach stop in town. Its coach drives between the depot and the hill.

Nov 1-10. The features were in. This phase made them hold on steep ground and in big cities, and made the hub easier to read.

  • Nov 1: a performance pass on a city of 355,000. With the mod removed, the frame rate changed by under 1 %.
  • Nov 1-2: a snow groomer drives the cat tracks, with its lights on at night. An A-Frame, Chalet or Grand lodge with no road can be supplied over a cat track.
  • Nov 2: a run’s type became a set of features: groomed or natural, with snow guns and lights as options.
  • Nov 3: on all four lift types, each chair and cabin hangs from a grip that follows the rope, and swings in the wind.
  • Nov 4: steep lines. Each lift type has a rope pitch limit per tower, and towers lean on steep ground.
  • Nov 5: the hand test of the steep-line build. The verdict: “very, very good”, with 27 notes to fix.
  • Nov 5: lifts of different types can cross, and towers keep off roads.
  • Nov 6: an existing city building can be merged into a ski area as a lodge. The ski area radius became an option, with a ring on the ground.
  • Nov 7: the hub was redesigned again: simple on the surface, with each number one layer down.
  • Nov 9: chairlift and gondola stations cut a level pad into the slope.
  • Nov 9-10: the Resort Planner plans the runs first, then proposes the lifts that serve them, and builds those lifts.
  • Nov 10: the game updated to 1.6.4f1 “Seasonal Shift”. The mod was checked against it the same day. The release screenshots were retaken on the final build.

Next: the final playtest, then 1.0 on Paradox Mods. For what comes after that, see the Rough Roadmap.